IoT Portfolio: IoTMail | CellTester | RoamingSIMs | Mastlink

Static IP for Battery Storage and Renewable Energy Sites

Energy aggregators require static whitelistable IPs for DNP3 polling. CGNAT makes this impossible. Speedroute BESS is the solution.

Battery energy storage sites on 4G need a static, whitelistable IPv4 for aggregator dispatch via DNP3 or Modbus TCP. CGNAT makes this impossible. Speedroute BESS delivers hardened static IPv4 on DIN-rail hardware for plant environments.

Ready to solve CGNAT permanently?

Request your free IPv4 Guide and we will follow up with the right solution for your installs.

Request Your IPv4 Guide →

Speedroute BESS specifications

Specification Detail
Mounting DIN-rail 35mm
Temperature -40°C to +75°C
Input voltage 9–50V DC
SIM Dual SIM, eUICC multi-network
Protocols DNP3, Modbus TCP — transparent pass-through
Static IP Dedicated BGP-announced public IPv4

Aggregator onboarding

  1. Order Speedroute BESS — static IPv4 confirmed at order
  2. Provide static IP to aggregator during pre-commissioning
  3. Aggregator adds IP to DNP3/Modbus whitelist
  4. Router installed on DIN-rail, powered on, tunnel auto-establishes
  5. Aggregator polls site — dispatch comms established
  6. IP never changes for the aggregator contract duration
Ready to solve CGNAT permanently?

Request your free IPv4 Guide and we will follow up with the right solution for your installs.

Request Your IPv4 Guide →

Ready to solve CGNAT?

Request your free IPv4 Guide and we will follow up with the right solution.

Request Your IPv4 Guide →

Request Your Free IPv4 Guide

The CGNAT Problem: A Field Guide for UK Installers — delivered to your inbox. We will also follow up with the right Speedroute solution for your installs.

Your details are used only to send the guide and follow up on your enquiry. No spam, no data sharing.

✓ Guide Request Received

Check your inbox. We will follow up within one working day with the right solution for your installs.